Wallace Campus Projects

Summer Projects - Volunteer Anytime

There are small projects that one or two people can tackle. Sign up here to work on some of these. We tackled many projects at the Fall Workday but many remain.

For more information please contact Bob Werth.  

 

Created by:   Robert Werth
 
Already signed up? You can change your sign up.

Available Slot

Refile music library and work on cataloging (3)

 
1 of 3 slots filled
John Hadeed
Jack hadeed

Paint outside of ceremonial doors to narthex

 

Clean and sanitize ice maker

 

Paint drywall repairs in the main building where repairs are complete

Ambul 2 above sconce near Admin module, Ambul 1 right of equipment doors, Ambul 2 near EC2 door, Ambul 2 east of AV desk, Amb 1 left of east doors

 
Jared Lamb

Install finger protection on EC2 restrooms and Quiet room

 

Finish repair of corner drywall in closet at west end of ambulatory and paint

 

Work on preparing utility module door for painting

Remove rotted wood, apply wood stabilizer, fill void, paint

 

Blend paint in closet near AV

 

Clean carpet and base in 2 Ambul 2 closets between EC and Admin

 

Paint inside of door frames to Mezzanine (Ambul trim paint)

 

Caulk & paint trim of big window at Mezzanine (Narthex trim paint)

 

Paint baseboards in children's rooms

Annex to Armour of God, Fruit of Spirit, EC2 hall, Pond, EC1 hall, EC1 outside door, bottom of door frames throughout building that don't clean up

 
Clara. Bill. Elyse Carey

Touch up paint in HATC restrooms

 

Prep and prime three stairway outside fire doors

 

Paint stained ceiling tiles

At AV Desk, below mechanical room, and Utility 2 hallway

 

Drill 6 new metal door frames for bumpers and insert bumpers

 

Remove wax from Worship Center chairs (2)

 

Weed Mother's Garden

Planting of two shrubs and tree will wait til fall.

 


©2019 SignUpGenius.
All Rights Reserved.
Privacy Policy | Terms of Service