Current Members 2018-19

Summer Workdays

We have a new compressor, new field lines, new glycol, and the ice shed is all shiny and bright white.  But we're not quite ready to install ice yet -- we have a bunch of finishing touches and prep work to take care of.  We'll be mostly sticking to our usual Wednesday evening schedule, with some additional days added here and there.

Location: SCC

Created by:   Dustin Mitchell
 
Already signed up? You can change your sign up.

Date (mm/dd/yyyy) Time (EDT) Available Slot
08/21/2019 (Wed.) 6:00pm - 8:30pm  

Workin' (6)

Work on various summer work-day jobs. Some lifting, some carpentry, some cleaning, some organizing of piles of stuff. All leading up to making ice starting Sept 13th.

 
All slots filled
Rob Klees
Natalie McDonough
John Adair
Jeff Howles
Christina Hall
Have to leave around 8 pm
Anthony Tripoli
08/28/2019 (Wed.) 6:00pm - 8:30pm  

Workin' (6)

Work on various summer work-day jobs. Some lifting, some carpentry, some cleaning, some organizing of piles of stuff. All leading up to making ice starting Sept 13th.

 
All slots filled
sue fink
Terry VanDelinder
Robert Maynard
Sue Hermitage
Terry Forrester
Andrew Dicke
08/29/2019 (Thu.) 5:30pm - 8:00pm  

Ice-field Washdown (12)

The ice field pipes are in and need a good â??wipe-downâ??. Bring clean shoes! Also bring clean rags and/or clean "dustbuster" vacuums if you have them. We will wipe the pipes and if time the side walls.

 
4 of 12 slots filled
Samantha Thornhill
I should be there by 5:45-6:00
Carol Munro
Paula Lancaster
Andrea Warr
09/04/2019 (Wed.) 6:00pm - 8:30pm  

Workin' (6)

Work on various summer work-day jobs. Some lifting, some carpentry, some cleaning, some organizing of piles of stuff. All leading up to making ice starting Sept 13th.

 
4 of 6 slots filled
Rob Klees
William Kaericher
Scott Kilbourn
Andrew Dicke
09/07/2019 (Sat.) 8:00am - 10:00am  

Ice-Shed Preparation (5)

Feather paint/touch up the side walls; wash down far/near end walls with Pine Sol; vacuum ice field; wipe down pipes on sheets 1/2

 
4 of 5 slots filled
Carol Munro
Lisa Miller
jim ridenour
Paula Lancaster
10:00am - 12:00pm  

Ice-Shed Preparation (5)

Feather paint/touch up the side walls; wash down far/near end walls with Pine Sol; vacuum ice field; wipe down pipes on sheets 1/2

 
4 of 5 slots filled
Carol Munro
Lisa Miller
jim ridenour
Brian Stewart
Will bring a shop vac
12:00pm - 2:00pm  

Ice-Shed Preparation (5)

Feather paint/touch up the side walls; wash down far/near end walls with Pine Sol; vacuum ice field; wipe down pipes on sheets 1/2

 
2:00pm - 4:00pm  

Ice-Shed Preparation (5)

Feather paint/touch up the side walls; wash down far/near end walls with Pine Sol; vacuum ice field; wipe down pipes on sheets 1/2

 
1 of 5 slots filled
Kat Slye
Michael might be with me
09/10/2019 (Tue.) 6:00pm - 8:30pm  

Install Preparation (6)

Prepare for making ice: get DI system installed, clean ice field, cover boards

 
All slots filled
Dion Warr
Emily Ciuk
Christian Erk
Michele Moffitt
Carol Munro
Paula Lancaster
09/11/2019 (Wed.) 6:00pm - 8:30pm  

Install Preparation (6)

Prepare for making ice: get DI system installed, clean ice field, cover boards

 
All slots filled
Sue Adair
Anthony Tripoli
Paul Castle
Andrew Dicke
Marek Rzonca
sue fink
09/12/2019 (Thu.) 6:00pm - 8:30pm  

Install Preparation (2)

Prepare for making ice: get DI system installed, clean ice field, cover boards

 
All slots filled
Kat Slye
I'll try to bring Michael with me!
Karen Denike
©2019 SignUpGenius.
All Rights Reserved.
Privacy Policy | Terms of Service