Summer Ice-System Work

Good news!  We are ready to start cutting field lines.  All 139 of them!

Current status:

  • Brine and ammonia have both been removed
  • Boards have been demolished
  • Compressor room has been emptied
  • All field lines have been cut and removed
  • Cooling tower has been torn down

Check back here throughout the summer to track progress.

Date: 06/19/2019 (Wed.)

Time: 6:00pm - 8:30pm EDT

Location: SCC

Created by:   Dustin Mitchell
 
Already signed up? You can change your sign up.

Available Slot

Scrap Cooling Tower & Brine Pipes (8)

disassemble the cooling tower and throw it in scrap dumpster. Can also scrap brine pipes and throw away clutter outside compressor room door

 
All slots filled
Bryan Gonyeau
Dion Warr
Robert Maynard
Will be arriving @6:20
Wayne Otte
Kirk Wallace
Marek Rzonca
Rebecca Trousil
WHOOOOOOOOOO PER
©2019 SignUpGenius.
All Rights Reserved.
Privacy Policy | Terms of Service

NO SLOTS AVAILABLE. SIGN UP IS FULL.